The test equipment is designed for electric and functional tests on single/three phase/e balanced load appliances.
There are one or more remote workstations to serve one or more production line not at the same time.
Test performed
- Earth Connector Efficiency
- Electric Insulation
- Dielectric Strength
- Earth leakage current
- Short circuit test
- Absorbed power

